Preparation of Design and Construction Management of works for the refurbishment of the facade of Zamora station.
Structural recovery of architectural elements that comprise the facades in such a way to allow for the interpretation of the building.
ADIF (Railway Infrastructure Administrator)
Start Date: 07/2007
End Date: 01/2010