Fondo Europeo de Desarrollo Regional. Unión Europea. Europa impulsa nuestro crecimiento
Arctica
Tecopysa Cotesa Enclave Fundación Tecopy

Study of infrastructure of the integral water cycle

STUDY OF INFRASTRUCTURE OF THE INTEGRAL WATER CYCLE

  • Phase 1: Analysis of sources of information
  • Phase 2: Analysis of current situation
  • Phase 3: Completion of diagnostics
  • Phase 4: Proposal of action measures
  • Phase 5: Determination of the cost of maintenance of the infrastructure

Study and analysis of the infrastructure situation and functioning of the Integral Water Cycle in all Municipalities in the Province of Valladolid with a Population of less than 20,000.
222 municipalities affected.
178,607 people affected

DUERO RIVER BASIN AUTHORITY

16 months